Walk-In Showers · San Antonio
Walk-In Shower Installation in San Antonio TX
Raging Bull Contracting · Owner Rey Trevino
Custom tiled walk-in showers — curbless entries, built-in benches, frameless glass — built in 3–7 working days. Labor from $3,500. Real tile over real waterproofing — what we recommend and build most. Acrylic is available if budget or speed decides it, and we say which is which up front.
Get your exact walk-in shower price in 24 hours
Free 30-minute walkthrough. Fixed-price written bid before I leave.
A real tiled walk-in shower — not an acrylic insert
Search for walk-in showers in San Antonio and the first companies you find sell one-day acrylic systems — plastic panels glued over your old walls by a commissioned sales team. We build the other kind: demo to the studs, bonded waterproofing on every surface — wedi or Schluter bonded systems, base and walls — real tile floor-to-ceiling, and custom frameless glass. It takes 3–7 working days instead of one afternoon, and it is the version that adds value to your home instead of flagging it on the inspection report.
Most walk-in showers we build start as unused tubs — if that is your situation, the tub to shower conversion page walks through the process step by step. And if you are budgeting the whole room, the 2026 bathroom cost guide breaks pricing down by size and scope. To see a real build — including the waterproofing layer that was missing when a leak reached a Sonoma Ranch homeowner's kitchen ceiling — read the Sonoma Ranch walk-in shower rebuild.
- Labor from $3,500 · Labor-only build. You choose the tile and fixtures and pay material cost direct — no markup. We handle demo, waterproofing, tile, and glass install.
- Turnkey from $6,995 · Standard tier. 12x24 porcelain tile, frameless glass, rainhead, handshower, built-in niche — we supply everything.
- Mid-range & luxury tiers · Priced by your selections. Curbless entry, built-in tiled bench, full-height designer tile, linear drain, dual rainhead, heated pan option. Each upgrade moves the final number up.
Recent San Antonio walk-in shower builds
The layer you never see

This is a downtown San Antonio shower at the waterproofing stage, shot before any tile went on. The grey panels are wedi board. Every seam and every fastener washer is sealed, the corner bench is boarded and sealed the same way, and the pan is a bonded wedi Fundo base with an offset drain.
After tile, none of this is visible again. It is also the layer a one-day wall liner skips entirely, and the reason a shower that looks fine on handover can leak into the subfloor three years later.
The project included demolishing my old tub/shower, installing a Wedi walk-in shower system… He used 12x24 tiles throughout the shower and created a beautiful corner bench.
Walk-in showers for seniors and aging in place
The most dangerous thirty seconds of a San Antonio home is stepping over a wet tub wall. A safe walk-in shower removes that step entirely — and done right, it looks like a spa, not a hospital. Every accessibility build we write includes the things that matter and skips the institutional look:
- Curbless or low-profile entry. Zero step, or a beveled curb under two inches. Wheelchair- and walker-friendly, and the same detail high-end spas use.
- Built-in tiled bench. A real mudded bench tiled to match the walls — not a plastic fold-down seat.
- Grab-bar blocking in the walls. We anchor solid-wood blocking behind the tile at the right heights, so grab bars can be installed now or years from now — into wood, not drywall anchors.
- Handheld shower on a slide bar + non-slip tile floor. Textured porcelain rated for wet floors, a thermostatic valve that prevents scald swings, and lighting in the shower itself.
If you are converting a parent's bathroom or planning ahead for your own knees, tell Rey at the walkthrough — the accessibility details are built into the same fixed price, not sold as add-ons.
Walk-in shower ideas for small bathrooms
Most San Antonio hall baths are 5x7 or 5x8 — and a walk-in shower is the single best move in that footprint. Removing the tub frees a 60x30 space, and a few design choices make a small room read twice its size: a single fixed glass panel instead of a framed door, tile run floor-to-ceiling on every wet wall, large-format 12x24 or 24x48 tile with tight grout lines, a recessed niche instead of a shelf jutting out, and a curbless entry so the floor runs unbroken from door to drain. A linear drain lets us slope the whole floor as one plane — which is what makes the curbless look work.
Small-bath walk-ins follow the same 3–7 working day schedule, and the tile, glass and fixtures you pick set the final price. See the size-by-size pricing in the 2026 cost guide.
What the walk-in shower customers said
Out of the six different companies we contacted for estimates, Rey Trevino & the Raging Bull Contracting team were the only ones who listened to our requests. We specifically asked to preserve our newly replaced shower glass, faucets, regulator, etc. to save on costs, & they were the only contractor willing to pay attention to those details instead of forcing additional materials & costs.… The quality of the walk-in shower tile work (shout out to Gonzo), the seamless texture match (thanks Edgar), and the new double-vanity installation are all top-tier.
The project was to remove the existing bathtubs and install a walk in shower while replacing all the wall tiles and floor tiles to current decor in two bathrooms. The modern vertical wall tiles with non slip marble floors give our home a complete makeover and we couldn’t be happier. To our surprise they finished the project even earlier while maintaining the quality workmanship.
They remodeled our Alamo Ranch bathroom and it looks beautiful. The custom walk-in shower with herringbone wood-look tile, glass enclosure and black fixtures came out stunning. Rey and his bilingual crew were professional, on time, and fairly priced.
Quoted word for word, spelling and all, from our Google Business Profile — 5.0 stars across 28 reviews. Read every one of them on Google.
Walk-in shower FAQs
- Labor starts at $3,500 — you choose the tile and fixtures and pay material cost direct with no markup. Turnkey walk-in showers start at $6,995, and the final price depends on the material tier you choose (standard, mid-range or luxury): tile, glass and footprint. A curbless entry or a built-in bench adds to the pan work. Every bid is fixed-price in writing before demo starts.


